The plan and the pace
Before you start

How long downsizing takes, and how to make a plan at your own rate

Published figures for how fast a house can be sorted are not worth using. Time one shelf, work out your own rate, and build a dated plan from it, with a plain account of what to cut first when the arithmetic does not work.

Start here Essentials

For a first pass, time one shelf, get your own rate from it, and book three sessions. If you are sorting alone, with no move and no date, that is the whole job for now.

  1. Time one container (a shelf, a drawer or a box) from start to finish, and write down how many containers you did and how many minutes it took (time one container).
  2. Enter that on the How long this will take page, with your estimate of the containers left and the hours you have each week.
  3. Read the finish date it gives, and the gap to your key date if you have one (when the arithmetic does not work).
  4. Put the first three sessions on a calendar, each with a room named (sessions, order and the calendar).

Minimum time: about two hours, most of it the timed container. Done when: three sessions are on a calendar, with a room named for each.

Why we publish no sorting rate Understand

Many sources promise a number: a room in an afternoon, a house in a weekend. We looked for a sorting rate with a source behind it and did not find one we would put in a manual. The professional curricula we read teach business practice, ethics, contracts and the moving trade. The consumer video courses are an hour long. None published a rate that we could cite. So the manual publishes none, and the How long this will take page uses none. The rate it uses is yours.

A rate that applies to everyone does not exist for a simple reason: the time an object takes depends on what the object is. A drawer of dish towels takes a glance per item. A drawer of papers takes reading. A shelf of a dead parent's books takes as long as the person needs. A single average over all of those hides the part that decides whether you finish: the categories that run slow. Reasoning, not a measurement

The method that replaces a published rate is a trial. You time one container and compute your own figure from it. Then you time a container of a different kind, because a rate from one does not carry to another. Test it

Time one container

A container is the unit the tool counts: one shelf, one drawer or one box. You decide which, and use it consistently. A trial is the sorting of one container, start to finish, with a timer running.

  1. Choose a container of ordinary difficulty. Not the easiest drawer and not the one you have been avoiding. A hall linen closet shelf is a fair choice.
  2. Start the timer and empty the container. Pick up each object once. Each one gets a destination, one of the six doors in How to sort a room, or goes into an undecided container with a date on it.
  3. Stop the timer when the container is empty and every object is in a pile or a bag with a door. Do not wait until the donation bag is in the car. Carrying it out is a separate task, and a separate line in your calendar.
  4. Write down the containers and the minutes, and who sorted. On the Rooms and sessions sheet, record the date, the hours, the containers done and the status.

Your rate is the minutes divided by the containers. If two people sorted together, the tool multiplies by the number of people, so the rate is per person. Leave the pauses in: the trip to the bin, the phone call, the object that needs a story. A plan has to hold real sessions, and a rate that leaves the pauses out is a rate you will not hit. The manual's own advice

Count what is left

The tool also needs the number of containers still to sort. Walk each room and count shelves, drawers and boxes. Round up. Count the boxes in each extra space (see Measure the space). This is an estimate, and the finish date inherits its uncertainty. A count that is off by a fifth moves the date by about a fifth. Write down which counts are guesses.

Calibrate by category, not by house

A rate from a linen closet does not apply to a desk or a basement. So time per category, and keep the rates apart. The table lists the categories most readers meet, and why they differ. These are the manual's reasoning, not measurements, and your second trial settles each for you.

CategoryWhy its rate differsWhat to time
Linens, towels, clothingMany similar objects; most decisions are quick; try-on questions slow someOne closet shelf or one drawer
KitchenDuplicates and sets, and objects whose use is not obviousOne cabinet or one drawer
Books and mediaQuick to judge, slow when each one is openedOne shelf of one bookcase
Tools and hardwareEach object needs to be identified, and many need a decision about whether it works or is usedOne box or one drawer
PapersEach page has to be read before a door can be chosen; some must be kept (see Papers, records and devices)One box, or one drawer, of papers
Photographs and lettersLooking is part of the decision, and the decision is about peopleOne box
A dead person's belongingsThe decision is about a person, and often about a family; see The hard thingsOne shelf or one box, with another person present
Boxes of unknown contentsOpening comes before sorting; the contents may be any of the categories aboveOne box

Papers, and anything that belonged to someone who has died, tend to take longer than the plan predicts. That is the manual's expectation. Time those two categories separately and leave extra room for them in the calendar. The manual's own advice

A hall linen closet and a storage unit full of boxes do not sort at the same speed. If your estimate of what is left is mostly one category, and you timed another, the date the tool shows is a first guess. Time a second container of the main category, enter it, and let the tool replace the guess. The tool lets you run it as many times as you like.

Sessions, order and the calendar

How long a session runs

The tool counts sessions at two hours each. That is the manual's convention, and not a measured limit, and no source gives a session length. Our reason is physical and practical: a sort asks you to decide hundreds of times, to bend, lift and carry, and to stay careful about what goes where. After about two hours, a session tends to get slower and the choices get less careful. Convention You can test this on yourself. Time the first half hour and the last half hour of a long session, compare the containers done and how many things you would reverse the next morning, and change the session length to fit. Test it Change the hours in your calendar, not the tool.

Sorting involves lifting, ladders, attics and basements. Get help with anything heavy or high, and stop before you are tired rather than after.

Which room first

Your situationStart withWhy
No deadlineThe easiest roomYou learn your rate on low stakes, and a finished room is something you can see
A deadlineThe room or space with the most volumeThe largest pile is the biggest risk to the date, and its rate is the one you most need to know
A route with a calendar of its own (a pickup, a hazardous waste day, a liquidator)Book it first, before you sortIt does not get faster when you do; see Donating, Selling and What can't go to the thrift store

The order for each row is the manual's own advice, with reasons but no source. The manual's own advice

Three sessions on a calendar

The Start here result is three sessions on a calendar, each with a room named. Put them on a real calendar, with a time, a room and what you need to bring. A plan that lives in your head is canceled by the first busy week. Choose rooms from the order above. Leave open sessions near the end of the plan for what slips. Two things slip most: papers, and anything that belongs to someone who has died. The other slip is a route that was not booked in time.

When to pay someone

The professional market has two main shapes. Senior move managers work on a range of services that the National Association of Senior Move Managers (NASMM) lists as space planning, sorting and downsizing, packing, arranging for the disposition of possessions, and resettling in the new home. NASMM's Senior Move Manager Certified designation, SMM-C, asks for four Cornerstone courses, nine certification courses and proof of 40 invoiced projects (NASMM, Certification). Professional organizers work on sorting and storage, and some train in chronic disorganization; The three situations names that training. The NASMM page tells you what someone holding the designation has done. It does not tell you a rate, a price for the work or how good any one person is.

You pay for hours of someone else's time in place of hours of yours. The manual makes no claim about whether that saves money; What each route pays shows the arithmetic for routes you choose. A few things to ask anyone you consider, and write down:

  • What they will do, in writing: sorting, packing, hauling, or only one.
  • How they charge, by the hour or by the project, and what is extra.
  • Where things go: who takes the donations, what happens to anything of value, what happens to the rest.
  • Whom they have done this for, and references you can call.
  • Whether they are insured, and for what.

Get three sets of written terms and compare the totals, not the headline rate. The manual's own advice If the house is not yours, confirm who has the authority to hire anyone before you sign (see The three situations).

When the arithmetic does not work

You will often enter your numbers and see a finish date after your key date. The page shows the gap. A gap is information about the plan: at this rate, in these hours, with this many helpers and this many containers, the sort ends after the date. It names four numbers that can change: the hours, the helpers, the containers sorted by hand, and the date. The answer to a gap is not to sort faster. It is to stop sorting some things and start routing them, in a particular order.

Routing means sending a whole container or room out by one door without deciding each object. A bulk donation pickup, a hired haul or a liquidator are routes. The order we suggest, from what to cut first, is the manual's own advice and rests on no source:

  1. Book the routes that have calendars of their own, now. A charity pickup, a hazardous waste day, a liquidator and a truck do not get faster when you do. They are a limit on the whole plan.
  2. Cut the second passes and the item-by-item selling. Re-sorting a room that is already sorted and listing objects one at a time are the first things to go. A bulk route takes the same objects with no listings.
  3. Stop sorting low-stakes rooms object by object. A garage shelf of paint cans and hardware, or a basement shelf of duplicates, can leave by the container once you have looked for the things that are not low-stakes: papers, photographs, jewelry, medicines, devices and anything with a name on it. Those stay in sorting.
  4. Protect the rest. The papers, the special handling items, the keep list and anything someone has said they want are not cut. They get the time instead.
Limits

A gap is a measurement of the plan, not a verdict on whether the job can be done. If you have a hard deadline and the tool shows a late date, the finding is that one of four numbers has to change. It is not that you should stop. This page cannot tell you which items are low-stakes in your house, what a bulk route will take, or whether a closing date can move. Who set the date can say whether it can move; a real estate agent or a lawyer can say what that would involve. If the house is not yours, authority comes first; see Clearing a house that isn't yours.

Fictional example

Marguerite Okonjo has eleven weeks to her closing and works with her daughter two evenings a week, about two hours each. That is four hours a week (our assumption), or 44 hours in all (4 times 11).

Open. Her rate and her container count, which she learns by timing a trial and counting. The test is to take the containers left, multiply by her minutes per container, and divide by 60. If the answer is more than 44 hours, the difference is the gap in hours. That is the amount she routes in bulk, starting with the basement and garage after a look for papers, photographs and the like, and the calendar-bound routes for what she wants gone.

Go deeper

Sorting with helpers

Two people do not sort twice as fast. Carrying and boxing may speed up. Deciding may not, and a helper who disagrees can slow it. We have no figure for it, and the tool asks for the people who sorted in the trial, then divides its estimate by the people in a normal week, assuming the work splits evenly. It often does not. One person decides while one carries. Run a second trial with your real helper and replace the assumption with a measurement.

Calibrating a second category

Choose the category that is most of what remains, time one container of it, and enter the new rate for that share of the count. If you have two big categories, enter each one separately and add the weeks.

When the date does not move

Once the order above has been used and a gap remains, the remaining levers are hours (more sessions, more helpers) and paying for routes. Ask what the paid route does with the objects, in writing, before you book it (see when to pay someone). If the date is a closing or a lease end, ask whoever set it whether it can move; that is a conversation for them, a real estate agent or a lawyer, and not one this manual can have for you.

See it: Tomás's trial See it

Fictional example

Tomás Beltrán, 41, Sacramento. He is not moving. He has two rooms he cannot use and a storage unit he has paid $148 a month for since 2019. He has no deadline.

Known. His trial was one hall linen closet: 4 containers (shelves) in 90 minutes, alone. That is 90 ÷ 4 = 22.5 minutes per container.

Assumed (his estimate). 60 containers in the two rooms and 40 boxes in the unit, so 100 containers. Six hours a week.

The arithmetic. At 22.5 minutes each, 100 containers take 2,250 minutes, or 37.5 hours. At 6 hours a week, that is about 6.25 weeks. At two hours a session, it is about 19 sessions (37.5 ÷ 2, rounded up).

Open. Whether the linen-closet rate holds for the unit's boxes. Papers and tools sort slower, so he times one box from the unit and replaces the guess: the weeks become (60 × 22.5 + 40 × box rate) ÷ 60 ÷ 6, with the box rate in minutes. The box rate settles it, and only Tomás can measure it.

The conclusion, under these assumptions. About 6.25 weeks, with the unit's boxes as the part most likely to move the date later. A finish date also tells him how many more months at $148 the unit might run, if he keeps it until it is empty.

Sources and tools for this chapter, each for one thing:

Practice: the trial and the calendar Practice

Minimum: one timed container, the rate entered in the tool, and three sessions on a calendar. Time: about two hours. Materials: a timer (a phone is fine), paper and pen, bags or boxes for the six doors, and a calendar.

  1. Choose and time the container. Start the timer, sort it, stop when every object has a door. Write down the containers and the minutes.
  2. Count what is left. Walk the rooms and extra spaces, count shelves, drawers and boxes, and round up.
  3. Enter the numbers on How long this will take, with your weekly hours and, if you have one, a key date. Write down the finish date and any gap.
  4. Log the trial on the Rooms and sessions sheet.
  5. Put three sessions on a calendar, each with a time, a room and what to bring. Choose rooms by the order above.
Go deeper

Time a second kind of container

Pick the category that is most of what remains and time one container of it, with whoever will really help. Enter the new minutes, the new people count and the containers of that category. Compare the finish date with the first. The difference between the two dates is the size of the error in your first guess. Lift boxes with a helper, and stop before you are tired.

Your situation Your situation

Check your work Check your work

Criteria

  • Is your rate your own, from a timed container, and not a figure from an article?
  • Did you count the pauses in the minutes?
  • Did you record the containers, the minutes and the number of people?
  • Are the papers and anything from someone who has died timed or planned apart from the rest?
  • Are three sessions on a calendar, each with a room named?
  • If the tool showed a gap, did you name which of the four numbers will change?

Worked example

Tomás meets the first three criteria: 4 containers, 90 minutes, alone, 22.5 minutes each, with the pauses in. He meets the fourth only in part. He has said the unit's boxes will sort slower but has not yet timed one, so the 6.25 weeks is a first guess and the box rate is the open fact. He has no deadline, so the fifth is his next step: three sessions with rooms named, starting with the easiest room and leaving the unit for a session after he times one box. The sixth criterion does not apply, because there is no gap to name.

Common mistakes

  • Using a published rate. There is none we would cite. Time one container.
  • Applying one rate to every category. A rate from a linen closet will not hold for a desk or a basement.
  • Timing only the quick part. Leave the pauses in.
  • Waiting for a perfect estimate. A rough count and a timed trial give a date you can adjust. No count gives none.
  • Reading a gap as a verdict. It says which number to change.
  • Planning with no open sessions. Something slips. Leave room for it.

What is still unresolved

This chapter cannot tell you your rate for a category you have not timed, or how a helper changes it. The trial does. It cannot say what a bulk route will take or charge; Donating, Selling and What each route pays do. It cannot tell you whether a date can move; whoever set it can. And it cannot say how to run a session; How to sort a room does.

Knowledge check and scenario

Tomás sorted 4 shelves in 90 minutes, alone. What is his rate?
90 ÷ 4 = 22.5 minutes per container, for linens, alone. It describes that closet and that day. It does not describe a box of papers.
Why should Tomás time one box from the storage unit before trusting 6.25 weeks?
The 22.5-minute rate came from linens. Papers and tools sort slower, so a rate from a linen closet will not hold for the unit's boxes. One timed box replaces the guess, and the finish date moves to match it.
Why does this manual publish no sorting rate?
We looked for a rate with a source behind it and found none we would cite. The time an object takes depends on what it is and who is deciding, so a single average hides the categories that run slow. The tool uses a rate from your own timed container.
The tool shows a finish date three weeks after your closing. What does that mean?
At your rate, hours, helpers and container count, the sort ends after the date. It names four numbers that can change: hours, helpers, containers sorted by hand, and the date. It does not mean the job can't be done. The usual answer is to route some things in bulk, in the order the chapter gives.
(Go deeper) Why run a trial with your real helper instead of assuming two people take half the time?
Carrying and boxing may speed up, but deciding may not, and a helper who disagrees can slow it. The tool assumes the work splits evenly, which it often does not. A trial with the real helper replaces that assumption with a measurement.
Marguerite enters her numbers and the tool shows a finish date three weeks after her closing. She says the job can't be done. What is the best next move?
Taking everything unsorted sends papers, photographs and things she wants kept out with the rest, and it ends her say over the china. A gap names a number to change. It does not call for dropping the keep list.
This follows the order: calendar-bound routes first, then bulk routing for low-stakes spaces after a look, with the papers and the keep list protected. It still leaves open what each route takes, which she learns by asking in writing.
A good step, since a trial with her daughter replaces the guess about helpers. It may close part of the gap. It does not replace routing if the gap is large, because the total hours are fixed by the calendar.

Checklist

Records your learning only; it is not a qualification.